Tong pushes forward with second phase of New Factory build

Tong pushes forward with second phase of New Factory build

Tong pushes forward with second phase of New Factory build

januari 14, 2021
Tong Engineering is delighted to announce the go-ahead for construction of the second phase development at its new manufacturing facility in Spilsby.

As part of a planned two-phase project, the company’s £3.6 million first phase building was completed in August 2020. And now the second phase build, of comparable investment, is set to commence on the seven-acre site this month, with plans to move into the new facility in the Autumn.

Edward Tong, Managing Director at Tong Engineering:
 
"We are very excited to be able to proceed with our plans for the next phase of our new factory. Despite a somewhat challenging 2020, we were extremely thankful that our plans for the first phase build were able to progress with minimal disruption, allowing us to start operating from the new site in the summer."

"Since the completion of our first phase building, we have noticed a huge difference in our final assembly capabilities and processes. After almost 6 months at the new site, it is now hard to imagine how we operated without the increased height and space that we now consider invaluable in the new factory. We are very much looking forward to enjoying these same advancements across all of our departments with the addition of the next phase building this year."
The purpose-built first phase manufacturing facility stands at over 126 metres long, 24 metres wide and 11 metres high. The new second phase build will see another facility, identical in size, constructed alongside the existing building. In addition, a third building will be constructed alongside the new second phase, predominantly for storage of components and equipment.

Edward Tong:
 
"We are currently working across two sites; the new site and our existing site which we have occupied for over 70 years. The new site is currently dedicated to our aftersales departments, stores and final assembly processes, and also houses our advanced new shot blasting and powder coating facilities."

"On completion of the second phase, all remaining departments at our existing site will transfer to the new site including our laser-cutting, steel preparation and fabrication divisions, as well as all office-based functions."
The second phase building will comprise of additional production space and will feature contemporary office space and meeting facilities at the front of the building. Among the plans for the new development is a beautifully appointed conference room overlooking the rolling Lincolnshire Wolds, which is set to be the perfect meeting place for Tong customers from the UK and worldwide to discuss their vegetable handling requirements whilst visiting the facility.

Edward Tong:
 
"The first phase building has already transformed our production, assembly and quality control processes. In preparation for the transfer of all departments to the new site this year, we have recently installed a second vertical storage lift in the new first phase building, allowing us to store a further 55 square metres of stock items and parts."

"Whilst it will feel strange to leave our existing family site that we have operated from for so many years, we are very eager to break ground on the second phase at the new site this month as we continue to fulfil our business expansion plans and ensure the continued development of our advanced and innovative range of vegetable handling equipment."
Like to receive news like this by email? Join and Subscribe!
Join Our Telegram Channel for regular updates!
Sponsored Content
Forsfood Partners with Zi-Vision to Expand into German, Dutch, and Belgian Markets
juli 08, 2024

Forsfood Partners with Zi-Vision to Expand into German, Dutch, and Belgian Markets

Forsfood, a leading provider of advanced peeling equipment and solutions, has announced a new partnership with Zi-Vision, marking a significant expansion into the German, Dutch, and Belgian markets.
Make a difference to children who would otherwise go without a decent education.
juni 30, 2024

TNA announces 'Packed with Purpose' initiative to support children’s education in disadvantaged communities

In an unprecedented event to raise funds to enhance the lives of children in disadvantaged communities, TNA, through its philanthropic arm, the Nadia and Alf Taylor Foundation, presents 'Packed with Purpose', a unique giveaway that gives entrants an unbelievable 1 in 200 chance to win the tna robag® worth USD 200,000.
An upgraded production line at Preziosi Food, featuring TNA solutions' state-of-the-art pellet frying system, significantly boosts snack output, achieving a remarkable 76% increase in production capacity.
juni 25, 2024

TNA partners complete snack solutions with Preziosi Food to achieve a 76% increase in production

With the snacks market in Italy accelerating and cost-conscious consumers increasingly turning to budget-friendly private-label goods, Preziosi Food, a leading Italian manufacturer of potato chips and snacks, needed a complete solutions partner with the capability to deliver significant production capacity increases in a very short 12-month timeframe.
Sponsored Content